News
Position:Index > News
- Flooring work
- Check the base level → Clean up the level base → Level basedealkalization → Select the floor board → Preparation of plaster →Paving stone materials → Mortar binding course → Maintenance →Clean up the..
20154-17
- Shandong dust processing equipment product principle
- Dust
treatment equipment:
The dust treatment equipment uses the water curtains of
multiple layers to absorb the smoke, and it is used to treat the dusts with
diameters of 0.01μm~100μm; the equipm..
20154-16
- Side draught smoke purification equipment
- Side draught flow guiding smoke purification equipment is a new generation of dedusting equipment developed by our base, which is a perfect combination of wet dedusting and cloth bag dedusting; it gi..
20153-27
- Fully enclosed stepwise automatic pickling
- Structure, composition, principle and features
The structure of fully enclosed stepwise automatic pickling production line, as shown in Figure 1, mainly consists of control system, automatic crane, ..
20153-23
- Construction process description of granite paved acid mist pond (jointed board)
- (Pickling pond): Check the base level → Clean up the level base → Level base dealkalization → Protection layer of glass fiber reinforced plastic → Rinsing, drying and trying for drainage of granite j..
20153-13
- Laying construction of resin fiber glass reinforced plastics shall meet the followings
- 1. Laying construction of resin fiber glass reinforced plastics shall meet the followings:
(1) Sealing bottom layer: You shall evenly brush resin oil on the well treated base course without missing ..
20153-7
- Galvanizing workshop front treating pond anti-corrosion engineerin
- Construction technology for front treating pond
1. After the foundation of front treating pond, start with 5-oil 4-cloth 1-bottom epoxy fiber glass reinforced plastics isolated layer, then lay the a..
20152-25
- Application of ceramic fiber module in galvanizing furnace brings the following advantages to our customers
- It has short installation cycle, the lining body requires no drying and maintenance, and it can be put into use upon installation, which is time-saving.
The folded carpet can squeeze each other tig..
20152-14
- There are mainly 2 forms in the design and construction of galvanizing furnace
- There are mainly 2 forms in the design and construction of galvanizing furnace, one is high-alumina ceramic fiber folded module and the other is high-alumina refractory material. The below is about a..
20152-6
- Touch screen images
- The touch screen of this system has four images: system status, system settings,temperature
curve and alarm information
System Status image
The system status image indicates the operating stat..
20152-4
- Vietnam point cremation zinc smoothly
- The company in Vietnam in December 20, 2014 a steel co., LTD., the project had been completed smoothly. This is the company in a foreign country to undertake a galvanized project, including furnace, ..
20151-19
- jinan jin yuan hot dip to install the ignition
- The company in 2014 in shandong jinan jinan jin yuan on December 6 hot plating co., LTD., the project had been completed smoothly. This is our company in China to undertake one of the biggest zinc p..
20151-7